As a leading National Environmental Balancing Bureau (NEBB) and Testing, Adjusting, and Balancing Bureau (TABB) -certified testing, adjusting, and balancing (TAB) firm, we have extensive experience in the testing and repair of commercial and industrial HVAC and fire and life safety systems.
From multi-story office buildings and medical facilities to large-scale university campuses and government buildings, SCI can handle any project with exceptional quality and performance.
Our experienced professionals hold a wide variety of certifications and designations, allowing us to work in some of the most regulated, specialized facilities.
Whether our clients need state and local regulatory compliance surveys or certification testing for biological safety cabinets, fume hoods, or other specialized laboratory equipment, we can assist them with specific solutions designed with the changing regulatory environment in mind.
We also pay particular attention to your fire systems so they will operate properly when needed. We take particular care with the maintenance and testing of fire and smoke dampers, stairwell pressurization systems and smoke control systems.
What sets SCI apart from our competitors is our ability to fix or repair whatever we uncover during the TAB, FLS (fire and life safety) Systems Testing, and Certification Testing process. If we find system performance or other problems, we can make recommendations, perform the work, and help you commission, re-commission, certify, and maintain your equipment.
SCI is a subsidiary of Gowan/Garrett, Inc., Houston’s largest single-source provider of premier construction, tenant build-out, fabrication, and mechanical services. No matter what need arises from the TAB process, SCI has the resources, manpower, and expertise to handle the work quickly and efficiently.
Tenant Build-Out Project Highlight
When a large law firm needed to expand and modernize its offices, they called on Gibson Electric for a complete package of electrical contracting services.
During the project, we installed a complete structured-cable system, the highlight of which was a data center build-out and riser providing high-speed interconnectivity to the rest of the office suites.
The facility’s two floors worth of data center space features:
Throughout the entirety of the project, Gibson Electric maintained our client’s strict move-in schedule. The remaining 25-floor build-out included: